Project: Stitska Rijeka Small Hydroelectric Power Plant, Montenegro
Year: 2020-2021
Scope of work: Erection of the Pelton turbine PH2c – 560/150and electrical generator
The scope of our company was to assemble the hydropower unit as follows: assembling the turbine and electrical generator, assembling the inlet valve, the by-pass system of the inlet valve and the hydraulic flow control system.
| Hydro Unit parameters | |
| Net Head [m] | 438,43 | 
| Output [kW] | 923 | 
| Flow [m3/s] | 0,24 | 
| Nominal speed [rpm] | 1500 | 