Project: Trysilfosen Small Hydroelectric Power Plant, Norway
Year: 2020
Scope of work: Erection of the Kaplan S-17,0/SR6A turbine, gear box and electrical generator
The scope of our company was to assemble the hydropower unit as follows: assembling the turbine and electrical generator, assembling the inlet valve, the gearbox and the hydraulic flow control system.
Hydro Unit parameters | |
Net Head [m] | 11,00 |
Output [kW] | 1575 |
Flow [m3/s] | 16 |
Nominal speed [rpm] | 257,11 / 750 |