METALURGIEI BOULEVARD 78BUCHAREST ROMANIA
PHONE 0040-21-406.60.11

Microhydropower plant Banesti-Floresti 1 and 2, Romania

Microhidrocentrala Banesti-Floresti 01 Picture10 Microhidrocentrala Banesti-Floresti 02 Picture11 Microhidrocentrala Banesti-Floresti 03 Picture12 Microhidrocentrala Banesti-Floresti 04 Picture13
Microhidrocentrala Banesti-Floresti 01 Picture10
Microhidrocentrala Banesti-Floresti 02 Picture11
Microhidrocentrala Banesti-Floresti 03 Picture12
Microhidrocentrala Banesti-Floresti 04 Picture13

Project: Microhydropower plant Banesti - Floresti 1&2, Jud. Caras-Severin, Romania

Year: 2014-2015

Scope of work: Mechanical assembly of hydroelectric equipment

Our company was in charge with the assembly of the mechanical part of the hydroturbogenerator (9 units): Francis hydraulic turbines, electrical generators (with power between 1119-2174 kW), inlet valves, hydraulic water flow control system and lubrication and control systems.

en_GBEnglish (UK)