Project: Microhydropower plant Banesti - Floresti 1&2, Jud. Caras-Severin, Romania
Year: 2014-2015
Scope of work: Mechanical assembly of hydroelectric equipment
Our company was in charge with the assembly of the mechanical part of the hydroturbogenerator (9 units): Francis hydraulic turbines, electrical generators (with power between 1119-2174 kW), inlet valves, hydraulic water flow control system and lubrication and control systems.