Project: Umski Potok Small Hydroelectric Power Plant, Montenegro
Year: 2020-2021
Scope of work: Erection of the Pelton PH3c – 500/170 turbine and electrical generator
The scope of our company was to assemble the hydropower unit as follows: assembling the turbine and electrical generator, assembling the inlet valve, the by-pass system of the inlet valve and the hydraulic flow control system.
Hydro Unit parameters | |
Net Head [m] | 149,52 |
Output [kW] | 454 |
Flow [m3/s] | 0,35 |
Nominal speed [rpm] | 1000 |